Sailent Features
1.Project Location
| Province | One |
| District | Taplejung |
| Rural Municipality |
Sirijhanga Rural Municipality
|
| Intake Site/Headpond |
At the Boundary of Sirijangha Rural Municipality (The then Mamamkhe & Kheban VDC) about 7.8 km upstream of the confluence of Tawa Khola and Kabeli Khola
|
| Powerhouse Site |
At the Jhorpul, Dovan of Sirijangha Rural Municipality (The Then: Pedang VDC) 2 km upstream of the confluence of Tawa Khola and Kabeli Khola
|
| Latitude |
27°22’40″N to 27°25’16″N
|
| Longitude |
87°50’58” E to 87°53’24″E |
2.General
| Name of River | Kabeli Khola |
| Nearest Town | Phidim, Ilam |
| Type of Scheme | RoR Cascade |
| Gross Head | 311.00 m |
| Net Rated Head | 297.83 m |
| Installed Capacity | 21.93 MW |
| Average Annual Energy after Outage | 135.84 GWh |