Sailent Features

1.Project Location
Province One
District Taplejung
Rural Municipality
Sirijhanga Rural Municipality
Intake Site/Headpond
At the Boundary of Sirijangha Rural Municipality (The then Mamamkhe & Kheban VDC) about 7.8 km upstream of the confluence of Tawa Khola and Kabeli Khola
Powerhouse Site
At the Jhorpul, Dovan of Sirijangha Rural Municipality (The Then: Pedang VDC) 2 km upstream of the confluence of Tawa Khola and Kabeli Khola
Latitude
27°22’40″N to 27°25’16″N
Longitude
87°50’58” E to 87°53’24″E
2.General
Name of RiverKabeli Khola
Nearest TownPhidim, Ilam
Type of SchemeRoR Cascade
Gross Head311.00 m
Net Rated Head297.83 m
Installed Capacity21.93 MW
Average Annual Energy after Outage135.84 GWh