KABELI HYDROPOWER COMPANY LIMITED

INTRODUCTION

Welcome to the realm of sustainable energy harnessed by Kabeli Hydropower Company Limited, a pioneering venture nestled in the picturesque landscape of Sirijhanga Rural Municipality in the Taplejung District of Province Number One, Nepal. Positioned along the pristine banks of the Kabeli Khola River, this hydropower project stands as a testament to Nepal’s commitment to harnessing its abundant natural resources for the greater good.

Kabeli Hydropower Company Limited

Sailent Feature

General

  • Name of River: Kabeli Khola
  • Nearest Town: phidim
  • Gross Head: 311.0m
  • Net rated Head:297.83m
  • Installed Capacity:21.93

Powerhouse

  • Type: Inverted U-shaped
  • Size(L*W*H) : 36m*15m*23.70 m
  • Number of Generating Units: 2
  • Turbine Type: Verticle Shaft,Pelton Turbine

Hydrology

  • Catchment Area:176.59 km
  • Mean Annual Discharge:16.36 cumecs
  • Design Discharge(at 46.3% PoE):8.60 cumecs

News And Notice

Breakthrough of 1182m HRT tunnel(Audit-2/Inlet)

Celebrating a Remarkable Achievement: Successfully Piercing Through the 1182m HRT Tunnel (Adit-2/Inlet) for Kabeli-3 HPP (21.93MW)

Date:-16th Feb 2024(4th Falgun 2080)